Method for producing culture vessel, and culture vessel

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12258548
APP PUB NO 20210380917A1
SERIAL NO

17411780

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In the production of a culture vessel in which a low cell-adhesive polymer as a coating agent is applied to a culture surface having a plurality of concave parts formed thereon, a use amount of the coating agent can be reduced. The low cell-adhesive polymer as the coating agent is applied to a surface of a culture base material in advance, and subsequently the culture base material is subjected to processing to form the culture vessel having the surface of the culture base material coated with the coating agent as the culture surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYO SEIKAN GROUP HOLDINGS LTD18-1 HIGASHI-GOTANDA 2-CHOME SHINAGAWA-KU TOKYO 1418627 ?1418627

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koseki, Osamu Kanagawa, JP 53 215
Matsuoka, Yosuke Kanagawa, JP 34 137
Nishiyama, Takaharu Kanagawa, JP 9 0
Tanaka, Satoshi Kanagawa, JP 959 10603
Totani, Takahiko Kanagawa, JP 29 58

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00