Candle including fuel supply part

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12258538
APP PUB NO 20240336872A1
SERIAL NO

18703225

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a candle including a combustion part; a wick support that is mounted to be attachable to and detachable from a bottom surface of a center of a storage space of the combustion part, has a flow tube, in which a fuel fed through a through-hole is able to flow upward due to capillary action, formed therein at a center of an inner portion to allow an upper surface and a lower surface to communicate with each other, and has a wick insertion hole formed at a center of the upper surface to allow a candle wick; a storage part having a fuel supply through-hole formed in one side surface of a lower portion; and a fuel supply communication part mounted to allow communication between the fuel accommodation through-hole of the combustion part and the fuel supply through-hole of the storage part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Owner owned or assignment not recorded

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahn, Sang Kueon Seoul, KR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00