Method of producing diesel from municipal solid waste and tire waste

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12258528
SERIAL NO

18322713

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing diesel from municipal solid waste (MSW and Tire Waste) without Fischer-Tropsch synthesis, the method includes sorting waste feedstock into conforming waste capable of being converted into hydrogen-rich gas. The conforming waste is then conditioned into a specific recipe of moisture, cellulose, and/or hydrocarbons, resulting in sized fluff. Upon testing and meeting a standard for elemental composition, the fluff is then pelletized to form a very dense, high-BTU-rich, consistent solid fuel feedstock. The solid fuel pellets are then processed thermally in a high-temperature pyrolysis system which converts the solid fuel into a hydrogen-rich fuel gas. The fuel gas is reconstituted, converting it into a liquid ULSD fuel. The liquid fuel is then further analyzed and upgraded into fully compliant renewable diesel fuel and other valuable byproducts.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SATY PATRICK EHUDSON FL

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
De, Laurentiis Gary Martin Tuguegarao, PH 1 0
Lent, Michael James Odenton, US 1 0
Ponchock, John Stuart, US 1 0
Saty, Patrick E Hudson, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00