Transition metal compound for a catalyst for olefin polymerization, catalyst for olefin polymerization comprising the same, and polyolefin prepared using the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12258433
APP PUB NO 20220275115A1
SERIAL NO

17627826

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a transition metal compound for a catalyst for olefin polymerization and to a catalyst for olefin polymerization comprising the same. Specifically, the present invention relates to a transition metal compound for a catalyst for olefin polymerization in which an allyltrimethylsilane substituent is introduced into the carbon-bridged cyclopentadienyl fluorenyl backbone and to a catalyst for olefin polymerization comprising the same.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HANWHA SOLUTIONS CORPORAION86 CHEONGGYECHEON-RO JUNG-GU SEOUL 04541

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jeong, Taeho Daejeon, KR 6 0
Jeong, Wook Daejeon, KR 20 47
Lee, Hyunseung Daejeon, KR 50 53
Lee, Won Jong Daejeon, KR 50 324
Park, Ranwha Daejeon, KR 7 0
Park, Seongyeon Daejeon, KR 7 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00