Systems for updating target maps including considerations of rotational position in electrochemical-additive manufacturing systems

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12257784
APP PUB NO 20240246299A1
SERIAL NO

18592327

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Described herein are electrochemical-additive manufacturing methods and systems using such methods. A method comprises depositing a material onto a deposition electrode by flowing a current between that deposition electrode and each of multiple individually-addressable electrodes, forming an electrode array. These currents are independently controlled based on a target map and using deposition control circuits, each coupled to one individually-addressable electrode. The target map is generated by a system controller based on various characteristics of the system (e.g., the performance of each deposition control circuit and/or individually-addressable electrode, electrolyte composition) and the desired characteristics of the deposited material (e.g., deposition location, uniformity, morphology). Furthermore, when the deposition electrode and the electrode array move relative to each other, the system controller dynamically updates the target map based on their relative positions. This movement can provide a fresh electrolyte between the electrodes and enable deposition at new locations.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FABRIC8LABS INC2324 WEST ST BERKELEY CA 94702

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gillespie, Joshua Poway, US 6 23
Herman, Jeffrey San Diego, US 61 2175
Pain, David San Diego, US 42 160
Shaik, Kareemullah San Diego, US 28 57

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00