Methods and systems for separating metals

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12257528
APP PUB NO 20240009588A1
SERIAL NO

18371846

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and systems for separating a first metal from a metal-containing feed stream are provided. The method can include applying solar energy, for example, by focusing one or more mirrors in one or more heliostats, to heat a metal-containing feed stream in a heating zone to a first temperature to produce a first vapor including the first metal. The first vapor can be condensed in a condensation zone to produce a first liquid including the first metal, and the first liquid can be collected. The system can include a separation unit include a heating zone in fluid communication with a condensation zone and a means for applying solar energy to heat a metal-containing feed stream disposed in the heating zone.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NANT HOLDINGS IP LLC9920 JEFFERSON BLVD CULVER CITY CA 90232

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Soon-Shiong, Patrick Los Angeles, US 637 13443

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00