Controlling rate of blood flow to right atrium

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12256935
APP PUB NO 20210177426A1
SERIAL NO

17054283

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Blood flow affecting implant and implantation thereof in superior vena cava, optionally including disintegration of endothelium layer and inducing tissue ingrowth within implant. Implant includes elongated body with optional tubular inner layer forming orifice, shapeable to final orifice diameter for restricting blood flowing therethrough to chosen average flow rate; and/or tubular outer layer provided coaxially around inner layer. Outer layer is formed of second material provided in elastically deformable state for facilitating elastic radial self¬expanding from collapsed diameter up to relaxed maximal expanded diameter greater than diameter of inner wall portion of superior vena cava. Inner layer is formed of first material, in plastically or elastically deformable state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VENACORE INC251 LITTLE FALLS DRIVE WILMINGTON DE 19808

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tal, Michael Gabriel Tel Aviv, IL 59 120

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00