Lead-free piezo composites and methods of making thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12256640
APP PUB NO 20220181543A1
SERIAL NO

17593968

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods of producing lead-free piezoelectric composites are described. The method can include adding a lead-free piezoelectric additive to a solution that includes a solvent and polymer solubilized therein. The solvent can have i) a boiling point ≥80° C. at 0.1 MPa and ii) a solubility in water of ≥0.1 g/g and/or a dielectric constant ≥20. The solvent can be removed to form a polymeric matrix having the lead-free piezoelectric particles dispersed therein. Electrical treatment of the polymeric matrix can form the piezoelectric component. Lead-free piezoelectric composites and devices that include the lead-free piezoelectric composites are also described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SABIC GLOBAL TECHNOLOGIES B.V.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Frescas, Jesus Alfonso Caraveo Thuwal, SA 10 55
Guhathakurta, Soma Bangalore, IN 10 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00