Radar transparent construction for illuminated symbols
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
Mar 18, 2025
Grant Date -
May 30, 2024
app pub date -
Nov 28, 2022
filing date -
Nov 28, 2022
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A multi-layer radome with an illuminated symbol. The multi-layer radome can include an overmolded applique, a light assembly, and a waveguide. The waveguide can be located between the light assembly and the overmolded applique. The waveguide can be configured to transmit light from the light assembly to the overmolded applique. The light from the light assembly can light up the overmolded applique resulting in an illuminated symbol. The multi-layer radome can utilize a two-layer construction.
First Claim
all claims..Other Claims data not available
Family
- No Family data available.
- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
INNOTEC CORP | 441 E ROOSEVELT AVE SUITE 100 ZEELAND MI 49464 |
International Classification(s)

- 2022 Application Filing Year
- H01Q Class
- 2826 Applications Filed
- 1412 Patents Issued To-Date
- 49.97 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Elenbaas, Michael G | Hudsonville, US | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 | |||
Veenstra, Thomas J | Lakewood, US | 20 | 253 |
# of filed Patents : 20 Total Citations : 253 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H01Q Class
- 0 % this patent is cited more than
- < 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Sep 18, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Sep 18, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Sep 18, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
