Secondary battery

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12255348
APP PUB NO 20220336919A1
SERIAL NO

17719837

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The secondary battery includes an electrode assembly to which an electrode lead is attached; a case configured to receive the electrode assembly therein; a lead film configured to surround a part of an outer surface of the electrode lead and interposed between the electrode lead and the case; a vent region formed in at least a part of the case; and a vent member inserted into the vent region and configured to contain linear low-density polyethylene having a poly dispersity index (PDI) of 4 or less, wherein the vent member has a maximum sealing strength of less than 6 kgf/15 mm at 100° C. or above and a maximum sealing strength of 6 kgf/15 mm or more at room temperature to 60° C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LG ENERGY SOLUTION, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hwang, Soo-Ji Daejeon, KR 47 298
Kang, Min-Hyeong Daejeon, KR 34 10
Kim, Sang-Hun Daejeon, KR 69 179
Lim, Hun-Hee Daejeon, KR 33 8
Song, Dae-Woong Daejeon, KR 22 7
Yu, Hyung-Kyun Daejeon, KR 43 82

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00