Field effect transistor including gate insulating layer formed of two-dimensional material

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12255244
APP PUB NO 20230197811A1
SERIAL NO

18171502

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a field effect transistor including a gate insulating layer having a two-dimensional material. The field effect transistor may include a first channel layer; a second channel layer disposed on the first channel layer; a gate insulating layer disposed on the second channel layer; a gate electrode disposed on the gate insulating layer; a first electrode electrically connected to the first channel layer; and a second electrode electrically connected to the second channel layer. Here, the gate insulating layer may include an insulative, high-k, two-dimensional material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO., LTD.; SEOUL NATIONAL UNIVERSITY R&DB FOUNDATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Yeonchoo Suwon-si, KR 50 134
Jang, Ho Won Seoul, KR 22 113
Lee, Minhyun Suwon-si, KR 66 169
Seol, Minsu Suwon-si, KR 77 164
Shin, Hyeonjin Suwon-si, KR 190 806

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00