Production line operation forecast method and production line operation forecast system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12254426
APP PUB NO 20230342675A1
SERIAL NO

17874302

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A production line operation forecast method and a production line operation forecast system are provided. The production line operation forecast method includes the following steps: obtaining an online production line work-in-process map at a time point, generating candidate simulated dispatch decisions based on the online production line work-in-process map, and inferring production-line work-in-process map changes of the candidate simulated dispatch decisions at a next time point; inputting the production-line work-in-process map changes to a forecast model, such that the forecast model outputs simulated production line operation health indicators of the candidate simulated dispatch decisions at the next time point; and selecting one of the candidate simulated dispatch decisions as a scheduling dispatch decision.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INDUSTRIAL TECHNOLOGY RESEARCH INSTITUTE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Hao-Jhe New Taipei, TW 1 0
Lin, Chung-Wei Hsinchu County, TW 88 548
Su, Tsan-Cheng Tainan, TW 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00