Method and system for multiphase flow meter using updated flow model based on simulated data

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12254252
APP PUB NO 20230004697A1
SERIAL NO

17363188

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method may include obtaining, from various sensors, acquired sensor data regarding various multiphase flows in a multiphase flow meter that are sampled at a predetermined sampling frequency. The acquired sensor data may describe various transient signals that correspond to various gas droplets. The method may further include generating, based on the acquired sensor data, a flow model for the multiphase flow meter. The method may further include updating the flow model to produce a first updated flow model using simulated flow data. The method may further include updating the first updated flow model to produce a second updated flow model using simulated sensor data. The second updated flow model may be used to determine one or more flow rates within a multiphase flow.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAUDI ARABIAN OIL COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alkhalaf, Muqbil Dhahran, SA 2 0
Arsalan, Muhammad Khobar, SA 83 369
Gryzlov, Anton Moscow, RU 4 0
Safonov, Sergey Moscow, RU 10 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00