Data center infrastructure optimization method based on causal learning

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12253928
APP PUB NO 20220004475A1
SERIAL NO

17289983

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods for active data center management by injecting randomized controlled signals in the operational controls of the cooling infrastructure of the data center and receiving response signals corresponding with the injected signals. The injected signals are used to adjust the operational controls of the cooling infrastructure, and the response signals relate to the operational conditions in the data center. Based upon the response signals along with independent and external variables, the randomized signals are continually injected into the cooling infrastructure and fine-tuned based upon the response signals. Optimum or improved parameters for controlling the cooling infrastructure of the data center are determined based upon the signal injections and corresponding responses.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • 3M INNOVATIVE PROPERTIES COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Benoit, Gilles J Minneapolis, US 117 456

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00