Systems and methods for controlling an energy supply system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12253873
APP PUB NO 20200310479A1
SERIAL NO

16832350

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are methods and apparatus for controlling an energy supply system. In an example the energy supply system includes a battery. In an example, provided is a computer-implemented method for controlling a battery. At least a portion of the method can be performed by a computing device including a processor. The method can include (i) creating, using a machine-learning model, a load prediction curve for a load for a current day, (ii) analyzing, to control peak energy use from an electric power source at a specific time, the load prediction curve to identify the specific time and a respective quantity of energy to transfer between the battery and a bus coupled between the electric power source and the load, and (iii) generating a battery controller input based on the identified respective quantity of energy to transfer. Various other methods, systems, and computer-readable media are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • POWERSECURE INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Calderon, Camilo Durham, US 1 2
Klaus, Keith Durham, US 1 2
Worth, Marshall Durham, US 4 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00