Lidar range and speed measurement method and LiDAR

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12253635
SERIAL NO

18976245

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A LiDAR range and speed measurement method and a LiDAR, are disclosed. Through the technical solution provided by the embodiment of the present application, it is possible to determine whether Doppler aliasing occurs based on a first local oscillator signal generated by a first laser and a second local oscillator signal generated by a second laser, the first local oscillator signal including multiple segments of first continuous wave signals, the second local oscillator signal including multiple segments of second continuous wave signals, the second continuous wave signal including a first swept frequency signal and a first constant frequency signal. In the event of Doppler aliasing, a first algorithm is used to calculate the distance and/or speed of the target object relative to the LiDAR, thereby improving the accuracy of the LiDAR ranging and speed measurement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUTENG INNOVATION TECHNOLOGY CO LTD1213 LIUXIAN AVENUE TAOYUAN STREET NANSHAN DISTRICT 1ST FLOOR BUILDING 9 BLOCK 2 ZHONGGUAN HONGHUALING INDUSTRY SOUTHERN DISTRICT SHENZHEN 518000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Xie, Jinwen Shenzhen, CN 5 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00