Device and method for measuring a duty cycle of a clock signal

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12253563
APP PUB NO 20230408580A1
SERIAL NO

17828135

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A duty cycle measurement (DCM) device includes a charge pump circuit and a clocked comparator circuit. The charge pump circuit is configured to receive a clock signal that has an unknown duty cycle and to generate a capacitor voltage based on the duty cycle of the clock signal. The clocked comparator circuit is configured to receive the capacitor voltage and a reference voltage and to generate a digital output code based on the capacitor voltage and the reference voltage. The digital output code is indicative of the duty cycle of the clock signal. The charge pump circuit is further configured to receive the digital output code. A method of determining a duty cycle of a clock signal is also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Roth, Alan Leander, US 111 893
Soenen, Eric Austin, US 112 728

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00