Apparatus for detection of electrical disturbances resulting from electromagnetic pulse

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12253552
APP PUB NO 20230296657A1
SERIAL NO

18296358

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus detects an E3 phase and E1 and E2 phases of an electromagnetic pulse (EMP). A pulse detector detects E1 and E2. A sustained level detector connects to a mains utility power supply line to detect E3. A delay timer holds an indication of a detected E1 or E2 for a predetermined time limit of about 10 minutes. A latch holds an indication that an EMP has occurred when an E3 occurs following an E1 or E2 within the predetermined time limit. An alarm indicates an EMP. A mechanical actuator disconnects the mains utility power supply line from utility power when an EMP is so indicated. The mechanical actuator can be mounted to a panel front face of a circuit breaker box in a configuration to push open a switch surface of a circuit breaker switch lever.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FARADAY DEFENSE CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bradley, Arthur Thomas Chesapeake, US 7 5
DeVries, Jason R Kalamazoo, US 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00