Methods and systems for automatic multi-phase mobile sampling collection and analysis

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12253440
APP PUB NO 20230003620A1
SERIAL NO

17365110

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fluid sampling device including an inlet configured to receive a portion of a non-homogeneous fluid flowing through a conduit, a first double block bleed valve coupled to the inlet, a first flexible hose coupled to the first double block bleed valve by a first quick acting and leakage free coupling, a collection drum coupled to the first flexible hose by a first control valve, and a container coupled to the connection drum by a manual valve, wherein the device is configured to collect a fluid sample in the container. The device also includes a pressure controller to control pressure within the collection drum, and a level indicator to indicate a level of fluid in the collection drum.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAUDI ARABIAN OIL COMPANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al-Khaldi, Ahmed Qatif, SA 1 0
Ansari, Nisar Ahmad Ras Tanura, SA 12 7
Soliman, Mohamed Ahmed Ras Tanura, SA 24 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00