Engine control device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12253035
APP PUB NO 20240209804A1
SERIAL NO

18542907

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An engine control device includes: a compression release cylinder selecting part that selects, from a plurality of cylinders, one or more compression release cylinders to which fuel is not to be injected, depending on the magnitude of a required torque of an engine having the plurality of cylinders connected to an exhaust pipe provided with a catalyst for purifying exhaust gas; an exhaust valve control part that opens the exhaust valve of the compression release cylinder; a fuel injection amount determining part that determines the amount of fuel to be injected into an operating cylinder that differs from the compression release cylinder among the plurality of cylinders, according to a load torque generated by opening the exhaust valve and the required torque; and an injection control part that causes fuel, according to the determined amount of fuel injection, to be injected into the operating cylinder.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ISUZU MOTORS LIMITED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ebe, Atsushi Fujisawa, JP 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00