Transmission and method for control of boost spool

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12253021
APP PUB NO 20240384682A1
SERIAL NO

18405801

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gas turbine engine includes a first spool, a second spool, a third spool, and a epicyclic differential. The epicyclic differential includes a sun gear, planet gears supported from a planet carrier, a ring gear, and a locking member, each housed within an accessory gearbox. The planet carrier couples to the second spool. The sun gear couples to the third spool, and the ring gear couples to engine accessories. A method of operating the gas turbine engine includes supplying a first fuel flow rate to a primary combustor associated with the first and third spools and supplying a second fuel flow rate to a secondary combustor associated with the second spool based on a power lever angle within an intermediate power level range.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RTX CORPORATION10 FARM SPRINGS ROAD FARMINGTON CT 06032

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hanrahan, Paul R Sedona, US 78 240
Kupratis, Daniel B Wallingford, US 53 833

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00