Structures and methods for lunar utilization

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12252899
APP PUB NO 20230108669A1
SERIAL NO

17977192

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A structure, system, and method utilize horizontal hole cavities on the moon for constructing dwellings, shopping areas, factories, industrial and power plants, government offices, towns, and for unmanned robot devices where cosmic rays and ultraviolet are not directly incident. The horizontal hole cavities are also utilized to store trash such as all waste materials on the earth including waste or trash, hazardous materials, and radioactive waste as well as all waste materials on the moon including such things as waste or trash, hazardous materials, and radioactive waste. The radioactive waste includes spent fuel, radioactive soil, radioactive liquid, and radioactive material produced by nuclear power plants during normal and accident conditions. The vertical hole cavities are utilized for building elevators and stairs, and pipes supplying oxygen produced by photosynthesis devices on the moon's surface and carbon dioxide produced by humans in the cavity are used as conduits.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Owner owned or assignment not recorded

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
NakaMats, Yoshiro Tokyo, JP 29 312

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00