Electronic control component bracket

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12252080
APP PUB NO 20230242053A1
SERIAL NO

18295479

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An object is to provide an electronic control component bracket that is less likely to cause a high acceleration (high-speed vibration). An electronic control component bracket 1 includes a bottom portion on which a plurality of elastic pieces configured to press a lower surface of an electronic control component upward are provided, and abutting stop portions configured to abut, from above, against the electronic control component that is pressed upward. The plurality of elastic pieces are provided such that, when vertical vibration is applied in a state in which the electronic control component is assembled, the amplitude of at least one elastic piece is larger than that of another elastic piece.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DAIWA KASEI INDUSTRY CO. LTD.; 501 TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kato, Makoto Okazaki, JP 278 3323
Takata, Kazunori Toyota, JP 15 57
Ukai, Junya Okazaki, JP 12 116

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00