Mobile solar charging facility

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12252040
APP PUB NO 20230182622A1
SERIAL NO

17998394

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mobile solar charging facility. The present invention relates to power supply and charging techniques for a mobile electric apparatus during movement, and in particular to such a facility having a combined technique of a solar photovoltaic battery and solar thermal power generation, and matching techniques and extended applications related to light compensation, energy storage, etc. The present invention is aimed at solving the problem of charging an electric vehicle when traveling. A highly cost-effective solar power source is used for power supply. The technical solutions of a contact rail and a collector shoe are used for mobile power supply and charging. An arc extinction circuit and an energy storage super-capacitor are provided in a line, and a safety protection measure is provided. A condenser lens and a compensation lens which can increase a power generation amount and do not need to be tracked as provided for solar power generation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhang, Chenghui Kunming, CN 23 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00