Driving device for energy replenishment port visor member

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12252006
APP PUB NO 20230087162A1
SERIAL NO

17947296

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This driving device for energy replenishment port visor member includes: a visor member which advances/retracts between an advanced position for covering, from above, a replenishment port exposed at a vehicle-body-side opening and used for replenishing a vehicle with energy, and a retracted position where the visor member is retracted from above the replenishment port; a visor driving unit which advances/retracts the visor member between the advanced position and the retracted position; a gun connection detection unit which detects whether or not an energy replenishment gun is connected to the replenishment port; and a control unit which causes the visor driving unit to execute advancing-driving for advancing the visor member from the retracted position to the advanced position, when the gun connection detection unit has detected that the energy replenishment gun is connected to the replenishment port in a state in which the visor member is at the retracted position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOYODA GOSEI CO., LTD.; 501 TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujisawa, Kazuki Nagoya, JP 8 6
Kaneko, Kenichiro Kiyosu, JP 60 341
Otsuka, Susumu Handa, JP 10 69

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00