Robot arm joint, connector and robot arm
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
Mar 18, 2025
Grant Date -
Dec 7, 2023
app pub date -
Apr 13, 2023
filing date -
Apr 13, 2023
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A robot arm joint, a connector and a robot arm are disclosed. The robot arm joint has a joint body and a joint wire assembly. The joint body includes a fixing end and a transmission end. The joint wire assembly is arranged in the joint body and extends on a preset connection path. The preset connection path includes a straight path. The joint wire assembly includes a torsion section connected to the transmission end and a fixed section connected to the fixing end. When the transmission end rotates, the torsion section is simultaneously driven to twist on the straight path.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
- CHIEFTEK PRECISION CO., LTD.
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Hsu, Ming-Che | Tainan, TW | 32 | 94 |
# of filed Patents : 32 Total Citations : 94 | |||
Wu, Syuan-Jyun | Tainan, TW | 4 | 2 |
# of filed Patents : 4 Total Citations : 2 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- B25J Class
- 0 % this patent is cited more than
- < 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Sep 18, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Sep 18, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Sep 18, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
