Closed socket brazed joint assembly

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12251769
APP PUB NO 20220347777A1
SERIAL NO

17866098

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A closed socket brazed joint assembly includes a first member, a second member with a first end having first and second faying surfaces, a socket in the first member that receives the second member with a faying surface with at least two portions separated by a first fillet. Before application of energy to the joint, there is a gap between the faying surfaces of the first and second members. A slug of brazing fill material is between the first end of the second member and at least one faying surface of the socket. Upon application of energy, the brazing fill material melts and flows from between first end of the second member and the at least one faying surface of the socket to fill the gap between the faying surfaces of the first and second members.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TRANSPORTATION IP HOLDINGS, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Apostolopoulos, Andreas Athanassios Erie, US 2 1
Edara, Ramesh Lawrence Park, US 2 1
Frampton, Alan Erie, US 1 0
Kessler, Kyle Erie, US 2 1
Wayne, James Erie, US 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00