Powder metal parts with improved machinability

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12251759
APP PUB NO 20230302536A1
SERIAL NO

18312678

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

It has been unexpected found that the machinability and corrosion resistance of powder metal parts can be greatly improved by incorporating calcium aluminoferrite powder, such as naturally occurring brownmillerite powder (Ca2(Al,Fe)2O5), into the part. Improved machinability is of enormous value in manufacturing countless parts where it is necessary or desirable to machine the part after it has been sintered, such as is frequently the case with gears, rotors and sprockets. In the practice of this invention, calcium aluminoferrite powder can also be incorporated into parts which will not necessarily be machined for the sole purpose of attaining better corrosion resistance. Surprisingly, the incorporation of the calcium aluminoferrite powder into such parts does not significantly compromise the strength, durability, or wear characteristics of the part and generally improves the service life of the part by providing better corrosion resistance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KEYSTONE POWDERED METAL COMPANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imbrogno, Peter G Dubois, US 13 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00