Independent heated hose

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12251724
APP PUB NO 20230130562A1
SERIAL NO

17905217

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A plural component dispensing system includes a first heated hose, a second heated hose, a controller, and a dispensing device. The first heated hose and the second heated hose include electrical wires that supply heat to the first and second heated hoses to heat fluid components within the first and second heated hoses. The first and second heated hoses are electrically coupled to the controller and are fluidly coupled to the dispensing device. The controller is configured to control and alternate the electrical power supplied to the first heated hose and the second heated hose to heat the first heated hose independent of the second heated hose.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GRACO MINNESOTA INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brudevold, Mark J Fridley, US 24 84
Peterson, Nicholas P Coon Rapids, US 8 1
Schneider, Stephen P Blaine, US 6 1
Smith, Matthew R Minneapolis, US 52 2009
Tix, Joseph E Hastings, US 67 337

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00