Device, method, and control system for waste to energy generation and other output products

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12251706
APP PUB NO 20240100539A1
SERIAL NO

18519624

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Aspects of the present disclosure include devices, systems, methods, and control systems for processing a feedstock into an output product having variable preselected characteristics. Various system components may include: 1) a feeder configured to convey the feedstock; 2) a mechanical pulverizer configured to pulverize the feedstock received by the feeder into pulverized feedstock; and 3) an air conveyor for conveying an air flow into the mechanical pulverizer and to draw the air flow from the mechanical pulverizer to a fines separator. The pulverized feedstock includes one or more of heavy fines, particulates, moisture, or combinations thereof. The air flow from the mechanical pulverizer includes at least a portion of the pulverized feedstock, wherein the portion of the pulverized feedstock is conveyed by the air flow.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EKAMOR RESOURCE CORPORATION610 N PICKARD AVE COOKEVILLE TN 38501

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Idelchik, Michael Cookeville, US 3 0
Warbis, Kelly Cookeville, US 6 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00