Vasospasm monitoring device based on triboelectrification technology

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12251198
APP PUB NO 20220304581A1
SERIAL NO

17611181

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vasospasm monitoring device based on a triboelectrification technology includes a vascular stent. A plurality of hole-shaped structures are distributed on the vascular stent. A triboelectric film sleeve is inserted into each hole-shaped structures in a matched mode, and the triboelectric film sleeve includes an inner electrode, an inner triboelectric material layer, an outer triboelectric material layer, and an outer electrode. The inner triboelectric material layer and the outer triboelectric material layer can generate electricity by friction, and the inner electrode and the outer electrode are electrically connected to a bioelectric signal processing patch.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ZHEJIANG UNIVERSITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cui, Xiaoxiao Zhejiang, CN 2 0
Jiao, Pengcheng Zhejiang, CN 10 3
Yang, Yang Zhejiang, CN 1214 8701

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00