Low power current integration DAC ramp settling assist circuit

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12250485
APP PUB NO 20230336165A1
SERIAL NO

17659041

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A ramp generator includes an operational amplifier having an output to generate a ramp signal. An integration current source is coupled to a first input and a reference voltage is coupled to a second input of the operational amplifier. A feedback capacitor and a reset switch are coupled between the first input and the output of the operational amplifier. The reset switch is turned on to reset the ramp generator. A ramp event is configured to be generated in the ramp signal at the output of the operational amplifier in response to the reset switch being turned off. An assist current source is coupled between the output of the operational amplifier and ground. The assist current source is configured to conduct an assist current from the output of the operational amplifier to ground in response to the reset switch being turned off.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • OMNIVISION TECHNOLOGIES, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sun, Tao San Jose, US 269 1665

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00