Crystal oscillator and method of making the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12249974
APP PUB NO 20230387884A1
SERIAL NO

18306619

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A crystal oscillator includes a piezoelectric substrate having a thinned portion with opposite upper and lower surfaces respectively defining upper and lower surface work portions, and at least one side portion having at least one recessed portion with a bottom surface flush with the upper surface of the thinned portion. A top electrode layer has a top work portion disposed on the upper surface work portion, and a top extension extending from the top work portion onto the bottom surface of the recessed portion. A bottom electrode layer has a bottom work portion disposed on the lower surface work portion, and a bottom extension extending from the bottom work portion toward the one end of the thinned portion and then bending upward and inward onto the bottom surface of the recessed portion. A method of making the crystal oscillator is also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AKER TECHNOLOGY CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Horng, Ray-Hua Taichung, TW 91 831
Lin, Yi-Lun Taichung, TW 9 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00