Motor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12249940
APP PUB NO 20230318510A1
SERIAL NO

18042789

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A motor including a first terminal and a second terminal to which a single-phase AC is input includes a third terminal, an AC/DC converter that converts a single-phase AC into a DC, an inverter that is PWM-controlled by a PWM signal to convert the DC into a three-phase AC, a controller that outputs a PWM signal to the inverter, and a detection circuit connected to the third terminal, in which the detection circuit outputs any one of a first detection signal, a second detection signal, and a third detection signal, and the controller outputs a PWM signal to be in a first rotation state when the detection circuit outputs the first detection signal, to be in a second rotation state when the detection circuit outputs the second detection signal, and to be in a third rotation state when the detection circuit outputs the third detection signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sakamoto, Mitsuhiro Osaka, JP 11 74

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00