Rotor, rotary machine, and method for manufacturing rotor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12249872
APP PUB NO 20230094490A1
SERIAL NO

17883624

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A first layer, a second layer, and a third layer of a sleeve of a rotor are integrated side by side in this order from the radial center of the sleeve toward the outside. The first layer includes a first fiber-reinforced resin including a first carbon fiber extending in a direction inclined with respect to both the axis of the rotor shaft and a circumferential direction of the sleeve. The second layer includes a second fiber-reinforced resin including a second carbon fiber extending along the circumferential direction of the sleeve, the third layer includes a third fiber-reinforced resin including a third carbon fiber extending along the circumferential direction of the sleeve. An elastic modulus of the third layer is larger than an elastic modulus of the second layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HONDA MOTOR CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ono, Yuji Saitama, JP 77 1474
Tada, Keiji Saitama, JP 15 97
Tomioka, Kaoru Saitama, JP 3 0
Ueda, Koji Saitama, JP 191 1495

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00