Airport electrical power charger system for charging aircrafts and ground support equipment

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12249835
APP PUB NO 20240022071A1
SERIAL NO

18327044

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an embodiment, an airport electric vehicle charging system includes a current transducer electrically coupled with a power source; a solid state converter electrically coupleable with an aircraft at or near an airport gate and configured to provide and maintain power to the aircraft; and a controller. The system further includes a first feedback loop between the controller and the current transducer; a second feedback loop between the controller and the solid state converter; and a battery charger electrically coupled with the power source and configured to charge one or more electric vehicles. The first feedback loop provides a first feedback signal generated by the current transducer to the controller. The second feedback loop provides a second feedback signal generated by the solid state converter to the controller. The battery charger is configured to consume power from the power source in accordance with the first and second feedback signals.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • OSHKOSH AEROTECH, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nestel, Steven U Ogden, US 8 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00