Power converter, method of controlling power converter, and computer readable recording medium

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12249832
APP PUB NO 20230155380A1
SERIAL NO

18157332

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power converter includes: an input unit configured to be electrically connected to a device; a voltage charge unit configured to change voltage; a voltage adjustment unit configured to adjust the voltage supplied to a transmission line; a target setting unit configured to set a first target value of the voltage change unit; a voltage monitoring unit configured to observe the voltage of the transmission line; and a threshold determination mechanism configured to calculate a second target value of the voltage adjustment unit in accordance with voltage of the transmission line. The target setting unit of the power converter is configured to generate the first target value as an output target of the voltage charge unit in accordance with the voltage observed by the voltage monitoring unit. The first target value has characteristics to change a threshold voltage for controlling output of the voltage adjustment unit depending on time.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FURUKAWA ELECTRIC CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abe, Asuka Tokyo, JP 7 0
Rikiso, Masahiro Tokyo, JP 9 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00