Beam target and beam target system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12249438
APP PUB NO 20220165446A1
SERIAL NO

17434689

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A beam target for generating a nuclear reaction product by irradiation with a beam obtained from a beam generation source includes a cone body which has a tapered inner surface which is reduced in diameter toward a tip, and supply means for supplying liquid metal to the inner surface of the cone body to form a liquid film of the liquid metal on the inner surface. It is possible to form the liquid film of the liquid metal on a cone body surface to increase an irradiation area of the beam, and also dispose a target substance such as LLFP around the cone body, and hence it is possible to efficiently use the nuclear reaction product (e.g., a neutron) generated by beam irradiation of the liquid metal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • RIKEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furutachi, Naoya Wako, JP 1 0
Mori, Yoshiharu Wako, JP 8 50
Okuno, Hiroki Wako, JP 14 105

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00