Radiation shielding material

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12249436
APP PUB NO 20230117723A1
SERIAL NO

17769654

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A radiation shielding material includes a main body having communication air holes and made of a base member constituting a three-dimensional reticulate skeletal structure, and a metal having radiation shielding capability. The radiation shielding material has moisture permeability through the communication air holes. The base member contains fibers, a foam material, a porous material, or a spongy material. The metal is provided in the form of a film so as to cover the surfaces of the base member of the main body. The radiation shielding material has a degree of moisture permeability of 1 g/m2 h or higher measured through the A-2 method that is a water method in accordance with JIS L 1099 where the temperature is modified to 20° C. and the humidity is modified to 65% RH.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ADEGG CO., LTD

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kawahara, Nobumasa Tokyo, JP 1 0
Suzuki, Yoshihiko Shizuoka, JP 103 1708

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00