Supplemental safety system and method for use of same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12248894
APP PUB NO 20220351115A1
SERIAL NO

17621628

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A supplemental safety system (10) and a method for use of the same are disclosed. In one embodiment of the system (10) a safety site plan (18) of a site and a safety site schedule (20) for the site are utilized. The safety site plan (18) includes a site plan of the site augmented with locationing information for work with a project geofence (58) therearound. The safety site schedule (20) for the site includes a work schedule for the site augmented with schedule data relative to a project pre-work phase (72), a project work phase (74), and a project post-work phase (76). The safety site plan (18) and the safety site schedule (20) are utilized to provide safety as a project advances from project pre-work (72) to project work (74) to post- work (76).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • RAILPROS FIELD SERVICES, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McDonald, James Irving, US 25 381
Smith, Chad Irving, US 96 930

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00