Smart switch with functionalities determined based on a grounded conductor connection

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12248330
APP PUB NO 20240160234A1
SERIAL NO

18384349

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein are system, apparatus, article of manufacture, method, and computer program product embodiments for modifying the functionality of an alternating current (AC) controlling device. An example computer-implemented method includes determining whether an electrical terminal of an AC controlling device is connected to a grounded conductor. In response to determining that the electrical terminal is connected to the grounded conductor, the example computer-implemented method includes generating a first control signal configured to permit the AC controlling device to perform a function. In response to determining that the electrical terminal is not connected to the grounded conductor, the example computer-implemented method includes generating a second control signal configured to prevent the AC controlling device from performing the function.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ROKU, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Garner, Gregory Mack Springdale, US 42 558

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00