Directing projected images for a vehicle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12248228
APP PUB NO 20240345449A1
SERIAL NO

18298600

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for directing projections within a vehicle includes a projector for producing a projected image. The system also includes a projection directing module in optical communication with the projector for directing the projected image to a predetermined location. The system also includes a projection surface upon which the projected image is projected. The system also includes a controller in electrical communication with the projector and the projection directing module. The controller is programmed to configure the projection directing module to direct the projected image to a projection region of the projection surface. The controller is further programmed to project the projected image on the projection region using the projector and the projection directing module.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GM GLOBAL TECHNOLOGY OPERATIONS LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Seder, Thomas A Fraser, US 207 6343
Sharma, Manoj Troy, US 119 2303
Szczerba, Joseph F Grand Blanc, US 198 6281
Weiss, John P Shelby Township, US 54 783

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00