Inspection device and manufacturing method of film-type battery

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12247938
APP PUB NO 20220205939A1
SERIAL NO

17561878

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An inspection device of a film-type battery is provided which can detect a poorly sealed site of a heat seal part. The present disclosure provides an inspection device of a film-type battery including an electrode body, and a film exterior body for accommodating the electrode body in the inside thereof, and having a heat seal part at the periphery thereof. The inspection device includes a temperature measuring device for measuring the temperature distribution of the heat seal part, and a first determination part for controlling the temperature measuring device in a prescribed time after forming the heat seal part at the film exterior body, and determining the presence or absence of a poorly sealed site based on the temperature distribution measured.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PRIME PLANET ENERGY & SOLUTIONS, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakashima, Satoshi Toyota, JP 88 679

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00