Air conditioning system with an integrated heat exchanger

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12247749
APP PUB NO 20230417426A1
SERIAL NO

17990048

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An air conditioning system is provided with an integrated heat exchanger. The air conditioning system generates heating air or cooling air through the integrated heat exchanger that adjusts the temperature of conditioning air by circulating coolant, thus securing cooling and heating efficiency. The air conditioning system adjusts temperature by the coolant circulated in the integrated heat exchanger such that a temperature adjustment door for adjusting the temperature of the conditioning air is eliminated, the number of components is decreased, and the size of an overall package is reduced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HYUNDAI MOTOR COMPANY; KIA CORPORATION; HANON SYSTEMS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Han, Kwang Ok Seoul, KR 16 76
Kang, In Jae Daejeon, KR 2 0
Kang, Su Yeon Seoul, KR 21 5
Kim, Myung Hoe Seoul, KR 74 81
Kwon, Dong Ho Yongin-si, KR 49 55
Lee, Dae Hee Incheon, KR 165 489
Park, Tae Young Daejeon, KR 36 148
Ryu, Jae Chun Daejeon, KR 30 116
Shin, Gee Young Suwon-si, KR 54 68

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00