Method for producing a corrosion and high temperature resistant aluminum alloy extrusion material

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12247277
APP PUB NO 20240150883A1
SERIAL NO

18413476

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing an aluminium alloy extrusion, consisting of an alloy with the composition ≤0.30% by weight of silicon, ≤0.40% by weight of iron, 0.01-1.1% by weight of manganese, ≤0.30% by weight of magnesium, ≤0.70% by weight of zinc, ≤0.35% by weight of chromium, ≤0.20% by weight of zirconium, ≤0.25% by weight of titanium, ≤0.20% by weight vanadium, ≤0.10% by weight of copper, up to 0.15% by weight of other impurities, each not greater than 0.03% by weight and the balance aluminium, the method comprising the steps casting the molten metal into extrusion billet a) subjecting the billet to a homogenization treatment at a holding temperature of 550 to 620° C. for 6 to 10 hours b) heating the billet to a temperature of 400 to 550° C. c) extruding the billet to a tube.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HYDRO EXTRUDED SOLUTIONS AS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Espedal, Arvid Mårslet, DK 3 1
Jiang, Xiao-Jun Haugesund, NO 6 39
Li, Minxia Suzhou, CN 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00