Offshore LNG processing facility

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12246805
APP PUB NO 20240002023A1
SERIAL NO

18369516

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An offshore LNG processing plant includes a first module including a personnel accommodation facility on a first vessel, a second module including a gas treatment facility on a second vessel, and a third module including a gas liquefaction facility on a third vessel. Each of the first, second, and third modules are assembled on the corresponding vessels, and then transported to an offshore location in a body of water, such as a river, a lake, or a sea. At the offshore location, each vessel deploys legs to the bed of the body of water to raise a hull of each vessel out of the water. The first module is then coupled to the second module, and the second module is coupled to the third module. A fourth module on a fourth vessel is coupled to the third module to provide LNG storage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NFE PATENT HOLDINGS LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoffart, Shawn D Miami, US 7 61
Shah, Alapkumar R Overland Park, US 2 0
Windeler, Christopher Michael Bowen Island, CA 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00