Additive free fabrication of polymeric composites with delayed and reduced dripping

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12246518
APP PUB NO 20220274386A1
SERIAL NO

17681044

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Multilayer composite materials are described herein. The multilayer composite materials have a first layer comprising a first polymer and a second layer comprising a second polymer. The first layer and the second layer abut each other. The first layer and the second layer each have a thickness in a range of about 10 nm to about 1 mm. The first layer and the second layer are arranged to provide for the multilayer composite material to have reduced dripping and a delayed first dripping time as they undergo a combustion process relative to a single layer material having a same thickness as a thickness of the multilayer composite materials.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bates, Frank S Minneapolis, US 37 357
Behzadfar, Ehsan Toronto, CA 1 0
Jordan, Alex M Menomonie, US 1 0
Kim, Kyungtae Minneapolis, US 136 924
Macosko, Christopher W Minneapolis, US 14 104

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00