Support frame for a method for sintering a body, in particular for watchmaking

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12246384
APP PUB NO 20220355373A1
SERIAL NO

17656657

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A support frame for a sintering step of a method for producing a part, in particular for watchmaking, from a green body having an initial shape, the body shrinking from the initial shape to a final shape during the sintering step, the support frame having at least one face for supporting the body during the sintering step, wherein the geometry of the supporting face is in relief and configured to support the body from its initial shape into its final shape, so that it retains its shape and proportions in line with a shrinkage coefficient related to the sintering operation. The disclosure further relates to a sintering method using this support frame.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • COMADUR SA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arede, Paulo La Chaux-de-Fonds, CH 6 1
Bubendorf, Denis Bevaix, CH 6 3
Cartier, Damien Besancon, FR 8 10
Vuille, Pierry Les Emibois, CH 58 84

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00