Selecting a modulation scheme to mitigate specific fault types in 5G and 6G

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12244334
APP PUB NO 20230387952A1
SERIAL NO

18227942

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Reliable communications is a central goal of 5G and 6G. However, due to signal fading at high frequencies and interference due to crowding, message faults continue to be a problem. Disclosed are methods for base station and user devices to adjust the modulation scheme according to the types of faults received, including amplitude faults (incorrectly demodulated amplitude levels) and phase faults (incorrectly demodulated phase levels), among others. The base station can select a more suitable modulation scheme based on the types of faults observed by user devices, such as modulation schemes with more or fewer amplitude levels and phase levels. In some versions, the number of amplitude levels is different from the number of phase levels, to combat specific fault problems.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Owner owned or assignment not recorded

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Massengill, R Kemp Palos Verdes, US 286 2460
Newman, David E Poway, US 258 1026

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00