Control method for a DC-DC converter and dc-dc converter

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12244235
APP PUB NO 20220360181A1
SERIAL NO

17633491

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for a phase-shifted full-bridge DC-DC converter. The method controls the DC-DC converter for energy transmission from a secondary side to a primary side of the DC-DC converter. A transformer is arranged between the primary side and the secondary side of the DC-DC converter. The method comprises a switching state, in which the terminals of the primary side of the transformer are electrically connected to one another, and in which, furthermore, the terminals of the secondary side of the transformer and the terminals of the secondary side of the DC-DC converter are electrically connected to one another.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ROBERT BOSCH GMBH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cello, David Stuttgart, DE 1 0
Kienzler, Christoph Gerlingen, DE 3 9
Riedel, Jan Esslingen Am Neckar, DE 9 3
Winter, Christian Tamm, DE 44 302

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00